Your Premier sales rep will calculate a sand/footing product ratio for your arena. Start by installing half of the additive. Set the other half aside for the second part of installation.

Select each clip to view

Loading Manure Spreader 0:26

Bales are compacted andย  wrapped with wire. Clip the wire and remove from work area immediately. There are two ways to decompress the bales: a manure spreader or by hand.

Spreading textile footing with manure spreader 0:54

Calculate the area and bales needed for the first half of install. Load into the manure spreader (you may need to do this several times). Distribute evenly over the surface as the spreader breaks apart the large chunks.

Watering the footing 0:16

Water provides a molecular bond to aid in mixing the sand and textiles. Apply water at approximately 40 gallons per 1,000 sq. ft. of material. Sand should be moist but not muddy.

Reverse tiller to mix footing & sand 1:43

Mix the product thoroughly into sand with chosen equipment. We suggest using a reverse tiller.

Premier Mini Pro Groomer 0:10

Premier Groomers have features and settings to mix and compact the footing surface.

Finished installation 1:07

Repeat steps with the other half of your product. Spread, water, and mix, then compact the surface.